DP2 Positioning
Kongsberg DP2 is listed in the vessel equipment package.

Delivered 2025 sister vessel with ≥90 t bollard pull, ≈480 m² deck, Kongsberg DP2, FiFi-1 and OSR-C2.
Kongsberg DP2 is listed in the vessel equipment package.
Four 1,800 kW generator sets feed twin 2,800 kW azimuth thrusters.
Approximately 480 mu00b2 deck cargo area with approximately 600 t deck cargo.
Bollard pull is specified as not less than 90 t.
FiFi-1 capability is listed in the equipment package.
OSR-C2 notation/equipment supports oil-spill-response capability.
The source describes SOM 04 as a 7,200 kW DP2 AHTS with approximately 6,500 nm endurance and 35 days endurance. Tank capacities include 580 m³ fresh water, 600 m³ fuel oil, 400 m³ liquid mud/brine, 170 m³ dry bulk, 14 m³ foam and 14 m³ dispersant.
AHTS configuration and AHT winch support anchor-handling work.
Class notation includes TOW and the vessel is configured as an AHTS.
Deck cargo and tank capacities support offshore supply duties.
FiFi-1 is part of the documented configuration.
OSR-C2 is included in the source configuration.
The source lists bollard pull as u226590 t (not less than).
Approximately 480 mu00b2.
A diesel-electric system with four 1,800 kW generator sets, two 2,800 kW azimuth thrusters and two 700 kW bow thrusters.
Yes. Kongsberg DP2 is listed.
Approximately 6,500 nautical miles and 35 days are listed.
The source states delivered 2025.