SOM 09 / SOM 10 – 70m DP2 AHTS Platform

2027 Slots

SOM 09 / SOM 10 – 70m DP2 AHTS Platform

Configurable 70.20 m DP2 diesel-electric AHTS platform with reserved 2027 delivery slots and ≥95 t reference bollard pull.

2027 Delivery Slots

Construction slots are reserved for 2027 delivery.

Configurable Specification

Bollard pull class, fire-fighting capability, tank groups, accommodation, POB, flag and class can be configured.

DP2 Diesel-Electric Platform

Platform basis is 70.20 m x 16.00 m x 6.80 m with DP2 and diesel-electric propulsion.

Reference u226595 t BP

The reference configuration specifies at least 95 t bollard pull.

480 mu00b2 Deck

Reference deck is 480 mu00b2 at 7.5 t/mu00b2.

FiFi-1 & OSR-C2

Reference configuration includes FiFi-1 and OSR-C2.

The source presents SOM 09 / SOM 10 as configurable newbuild slots based on the proven 70.20 m DP2 AHTS platform. Reference configuration includes FiFi-1, OSR-C2, ABS class and 480 m² deck area at 7.5 t/m².

Specifications

LOA70.20
Beam16.00
Main EngineDiesel-electric
Class SocietyABS
AvailabilityAvailable for booking — construction slots reserved
Platform70 m DP2 AHTS platform u2014 slots for 2027 delivery
AvailabilityAvailable for booking u2014 construction slots reserved
SpecificationConfigurable to owner requirements (BP class, fire-fighting capability, tank group, accommodation standard)
Platform Basis70.20 m x 16.00 m x 6.80 m, DP2, diesel-electric
Reference Configurationu226595 t BP u00b7 FiFi-1 u00b7 OSR-C2 u00b7 ABS u00b7 480 mu00b2 deck @ 7.5 t/mu00b2
Series Track Record4 delivered + 2 delivering 2026 to SEA owners
Configurable ItemsBollard pull class u00b7 FF capability u00b7 tank groups u00b7 POB u00b7 flag & class
Proven PlatformFour sister vessels in service; two further sister-vessel orders deliver to Southeast Asian owners in 2026
Validated ConfigurationDiesel-electric plant with DP2, FiFi-1 and OSR-C2 u2014 same technical route as recent regional newbuild orders
Cost-competitive ConstructionEstablished Yangtze River Delta marine supply chain and a yard currently building sisters 07/08
Delivery CertaintySlots reserved alongside Hulls 07/08 u2014 stable and clearly managed delivery schedule

Benefits

Anchor Handling

AHTS platform can be configured for anchor-handling service.

Towing

Reference platform is based on the same AHTS technical route with bollard-pull configuration options.

Offshore Supply

480 mu00b2 reference deck and configurable tank groups support supply roles.

Fire-Fighting

Fire-fighting capability is configurable, with FiFi-1 in the reference configuration.

Oil Spill Response

OSR-C2 is included in the reference configuration.

Frequently Asked Questions

When are SOM 09 / SOM 10 delivery slots planned?

The source lists slots for 2027 delivery.

Are the specifications configurable?

Yes. The source lists bollard pull class, fire-fighting capability, tank groups, accommodation standard, POB, flag and class as configurable items.

What is the platform size?

70.20 m x 16.00 m x 6.80 m.

What is the reference bollard pull?

At least 95 t.

What deck area is referenced?

480 mu00b2 at 7.5 t/mu00b2.

What is included in the reference configuration?

DP2, diesel-electric propulsion, u226595 t BP, FiFi-1, OSR-C2, ABS and a 480 mu00b2 deck are listed.

Related Vessels